Trusted by the world's leading real estate owners








[Why now]
PJM serves 67 million people. It can't add power as fast as data centers need it, and rates are rising as a result.
11×
Rise in PJM capacity prices since 2024
$325
Per MW-day: the price cap, hit again in July
6.8 GW
Short of what the grid needs in 2028
Sources: PJM 2028/29 capacity auction (July 2026); Utility Dive. Lumen is not a party to the Google–Voltus agreement.
[On your property]
One or two rows of weatherproof cabinets on unused parking or land. The operator builds, insures, and maintains it for the life of the lease, then removes it at its own cost.



[Why Lumen]
Lumen is the transaction platform that delivers landlords the best economics. We see the whole market and have completed hundreds of transactions.
1M+
Sites profiled
100s
Transactions completed
$0
Cost to you
[FAQ]
Yes. You pay nothing for the battery, install, or upkeep. A data center company's long-term capacity contract pays for it.
The operator owns, insures, and maintains the battery for the full lease. You own the property and lease them the space.
Battery systems are built to national fire codes, tested at scale, and reviewed by your local fire authority before they switch on. The operator carries the insurance.
The operator removes the battery and restores the space at its own cost, or you agree to extend.
Often, yes. Low-utilization or excess parking is a common site type, alongside yard space and other underused land. The main requirements are about 10,000 sq ft, road access for construction, and enough distance from homes and schools. Lumen's free evaluation confirms whether a parking area on your property fits.
The lease runs with the land, so it transfers to a new owner along with the property. Lenders and buyers see it as a fixed income stream tied to the parcel, and Lumen will work through any disclosure or estoppel documents they need.
If your property is financed, most mortgages require lender consent or notice before you sign a long-term lease. Loop your lender in early; Lumen and the operator can provide the lease terms and site plan for that review.
Your cost is $0. The operator funds construction, insurance, operations, and removal. Lumen is paid by the winning operator, and only if a project is built.
[Get started]
Most sites that qualify share four things. Not sure? Send the address and we'll check for you.
It's on the PJM grid. Thirteen states, from Illinois to New Jersey.
10,000+ sq ft to spare. Unused parking, yard, or land.
You control the land. You own it or hold a long ground lease.
Room from neighbors. About 150 ft from homes and schools.
*Estimated savings, not a guarantee. Results depend on utility, tariff, and load.